SUPPLY & FIT · DUNFERMLINE & FIFE

SPECIFICATION

Latex Screed & Subfloor Preparation

Nearly every flooring failure we are called out to is a subfloor failure, not a product failure. Preparation is the least glamorous line on a quote and the one that decides whether the floor is still flat in five years.

LATEX SCREED
Self-levelling compound over concrete — 3mm to 10mm typical
PLY OVERLAY
5.5mm or 6mm ply screwed to timber floors before vinyl or LVT
MOISTURE TESTING
Hygrometer or carbide test before bonding to concrete
SURFACE DPM
Epoxy membrane where a slab reads damp or has no DPM

Why we test rather than assume

A concrete slab can look and feel dry and still be well above the moisture threshold for a bonded floor. In older Fife properties with no original damp-proof membrane, or a new-build with a screed still drying, bonding LVT or wood straight down means lifting adhesive within months.

Testing takes minutes at survey and it changes the quote honestly rather than producing an unwelcome surprise on fitting day.

Timber floors and ply overlay

Chipboard and floorboard subfloors flex between joists and their joints open and close. Under a thin glue-down floor those joints eventually telegraph through as ridges. A screwed ply overlay creates a continuous, stable surface — and the screws go in at 150mm centres, not wherever is convenient.

For a carpet fit, ply overlay is usually unnecessary. We do not add work that does not change the result.

Questions we get asked

Free Survey
On-site, no obligation
Workmanship Warranty
Every fit guaranteed
Local Fitters
Dunfermline-based team
Expert Support
From quote to handover
BOOK YOUR FREE SURVEY

Ready to fit your dream floor?

Free, on-site survey across Fife. No-obligation quote within 48 hours.